Siding

Siding contractor leads: the job you win at day 90

By Scavi Company · · 12 min read
Siding contractor leads: the job you win at day 90

Siding fails slowly and visibly, which means nobody calls you in a panic. The homeowner has been thinking about it for eighteen months and finally decided to get quotes — and that single fact changes everything about how leads behave in this trade. The median time from first inquiry to signed contract runs 45 to 120 days, and most contractors mentally write a quote off at day 30. The job goes to whoever was still following up.

What a siding job is actually worth

Siding sits in a strange spot in the trades. The job is large — most full replacements land between $12,000 and $38,000 — but the homeowner rarely wakes up wanting it. Unlike a roof that leaks or an HVAC unit that dies in August, siding fails slowly and visibly, which means the trigger is usually appearance, an inspection report, or a neighbor who just had it done.

That single fact shapes everything about lead generation in this trade. You are not catching emergencies. You are catching people who have been thinking about it for eighteen months and finally decided to get quotes.

Typical job values, materials and labor combined, on a 1,800 square foot two-story home:

  • Vinyl siding, full replacement: $11,000 to $22,000
  • Insulated vinyl: $16,000 to $30,000
  • Fiber cement: $22,000 to $45,000
  • Engineered wood: $19,000 to $38,000
  • Partial replacement or one elevation: $3,500 to $11,000
  • Siding repair and rot remediation: $900 to $6,500

Gross margin on a well-run siding job typically runs 28% to 40%. That means a $24,000 fiber cement job contributes roughly $7,700 to overhead and profit. The number that matters for marketing: if a customer is worth $7,700 in gross profit and you close one in four, a $500 lead is a $2,000 acquisition cost against $7,700 — a trade most contractors would take all day if they ever measured it.

The number almost nobody tracks

Siding is the most visible exterior work there is, and it changes the entire look of a house on a street where every house looks similar. Contractors who track neighbor-sourced jobs routinely find 20% to 35% of siding revenue comes from houses within sight of a job they already did — and almost none of them do anything deliberate to produce it.

Where siding leads actually come from

Six sources, ranked by what they produce for a residential siding company.

The job site itself. A siding crew is a five-day billboard on a residential street, and the transformation is dramatic enough that neighbors stop and stare. Yard signs, door hangers on the twelve nearest houses, and a crew trained to hand out a card produce leads at effectively zero cost. In this trade specifically, this should be source number one, not an afterthought.

Local search. Search intent is strong but volume is lower than roofing or HVAC because the problem is not urgent. A complete profile with dozens of recent before-and-after photos, correct service area, and steady review flow outperforms most paid campaigns.

Paid search. Works, with a caveat that catches new advertisers: siding searches skew heavily toward research, and cost per lead typically runs $120 to $380 depending on market and material searched. Fiber cement and James Hardie searches cost more and are worth substantially more.

Storm and insurance work. In hail and wind regions, siding damage rides along with roof claims. Partnering with a roofing company that does not do siding is one of the most productive relationships in this trade.

Referral partners. Realtors preparing a house for sale, home inspectors who flag siding in reports, window installers, painters who keep getting asked to paint siding that should be replaced, and property managers.

Retargeting your own quotes. Unique to this trade and almost universally ignored — more on that below.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

The long decision cycle nobody plans for

Here is the number that explains why so many siding contractors think their marketing does not work: the median time from first inquiry to signed contract in residential siding is 45 to 120 days, and a meaningful share of jobs close six to eighteen months after the first quote.

Most contractors quote, follow up twice, and mentally write the lead off at day 30. Then the homeowner signs with someone else at day 90 — often someone who simply stayed in touch.

Three changes fix this:

Build a real follow-up sequence, not two calls. Day 2, day 7, day 21, day 45, day 90, then quarterly. Most of those touches should carry something useful — a photo of a similar house you just finished, a note about material pricing, a seasonal scheduling window — not "just checking in."

Segment quotes by reason for delay. "Waiting on financing," "getting more quotes," "doing it next spring," and "waiting on my spouse" are four different problems that need four different follow-ups. Recording the reason at the quote takes ten seconds and doubles the usefulness of the list.

Treat unsold quotes as an asset. A siding company with 200 unsold quotes from the last two years is sitting on $4 million in quoted work. A single well-written email in February offering an early-season scheduling incentive routinely reactivates 3% to 6% of that list — which for most companies is a better month than any ad campaign produced.

The estimate is your entire sales process

Siding is a high-consideration purchase where the homeowner cannot evaluate quality, cannot judge the crew, and often cannot tell two materials apart. So they evaluate the only thing they can: how you showed up.

Five things separate a winning siding estimate from a losing one, and price is not on the list.

Physical samples. Carry six to ten sample boards with actual colors and profiles. Homeowners are not buying siding — they are choosing what their house will look like for the next twenty-five years. Nobody makes that decision from a printed brochure.

A rendering or visualizer. Showing the customer their own house in the color they are considering closes jobs at a dramatically higher rate. Several manufacturers provide this tool free.

An honest inspection of what is underneath. Pull a piece. Show the sheathing, the housewrap, the rot if there is rot. Photograph it. This is the single most persuasive thing that happens during a siding estimate, and it also protects you from the change order fight later.

A written scope with the boring items itemized. Housewrap, flashing, trim, soffit, fascia, gutters removed and reinstalled, disposal, and rot allowance. Cheap competitors leave these out, and an itemized scope makes the price difference visible instead of arguable.

Financing presented, not mentioned. On a $26,000 job, a monthly payment reframes the entire conversation. Contractors who present financing on every estimate — not just when the customer flinches — close measurably more work at higher averages.

Where most siding contractors lose the job

Not on price. On the rot allowance conversation. If you do not set expectations in writing about what happens when the crew finds rotten sheathing, you will have a change order fight on 30% to 50% of jobs — and that fight costs you the referral, the review, and the neighbor. Quote a defined allowance with a clear per-sheet price beyond it, and the conversation becomes routine.

One month, with the leaks closed

A siding company running three crews in a mid-size market tracked ninety days of lead flow and found the same pattern most companies have and never measure.

Starting point, per month: 64 leads, 39 estimates delivered, 11 jobs closed at an average of $19,400. Revenue: $213,400. Gross margin at 33%: $70,422.

Where the leaks were: 25 leads never became estimates. Of those, 16 were never reached after two call attempts, and 9 were reached but never scheduled. Of the 28 estimates that did not close, 21 had no contact after day 30.

Three changes, none of them marketing spend: a five-attempt contact rule across call, text, and email in the first 48 hours; same-day estimate scheduling offered on the first call; and a structured six-touch follow-up sequence out to day 90.

Ninety days later, per month: the same 64 leads produced 51 estimates and 16 jobs at an average of $20,100 — the average rose because samples and financing were now presented on every estimate. Revenue: $321,600. Gross margin at 33%: $106,128.

The difference: $35,706 in gross profit per month, from the same lead count and the same ad budget. Annualized, that is $428,472 that was already in the business and was walking out through unanswered calls and abandoned quotes.

Storm work: opportunity and trap

In hail and high-wind markets, siding damage claims are a large share of the available work, and they behave nothing like retail siding jobs.

What makes it attractive: the homeowner is not price shopping the same way, the timeline is compressed, and volume arrives in concentrated bursts. A single storm can produce a year of work in one neighborhood.

What makes it dangerous: payment depends on a third party, scope disputes with adjusters are common, supplements take time and expertise, and a company that staffs up for storm volume and then has no retail pipeline gets caught badly when the work runs out.

The companies that do this well treat storm work as a supplement to a retail business, not a replacement for one — typically capping it at 30% to 50% of annual revenue. And they never, ever tell a homeowner what an insurance company will or will not pay, or offer to cover a deductible, both of which create serious exposure.

Selling the material, not the price

The single biggest lever on siding profitability is the mix of materials sold, and most contractors default to whatever the customer names first.

A useful framing for the estimate conversation, presented as three tiers rather than one recommendation:

The value option. Standard vinyl. Lowest cost, proven, wide color range, minimal maintenance. Honest about what it is.

The performance option. Insulated vinyl or engineered wood. Better appearance, added insulation value or dimensional look, meaningful step up in both price and margin.

The premium option. Fiber cement. Best durability and resale impact, highest price, and the option most likely to be chosen when the homeowner plans to stay long-term.

Presenting three tiers does two things at once: it moves the conversation from "is this expensive?" to "which one?", and it consistently lifts average ticket. Contractors who switch from one-price quoting to three-tier quoting typically see average job value rise 12% to 20% without any change in close rate.

Five mistakes that cost siding contractors money

  • Writing off quotes at 30 days. In a trade with a 45 to 120 day median cycle, this discards half the pipeline.
  • Not quoting a rot allowance. Guarantees a change order fight on a third of jobs and poisons otherwise good projects.
  • Ignoring the neighbors. The highest-converting, lowest-cost lead source in the trade, sitting twelve houses away for free.
  • Estimating without samples. The homeowner is choosing an appearance, and you showed up with a number.
  • Building the company on storm work alone. The volume is real and it ends, and companies that staffed up for it rarely survive the gap.

The numbers to watch

  • Lead-to-estimate rate, and the reason every lead that did not convert failed to.
  • Contact attempts per lead in the first 48 hours — the leading indicator that predicts everything downstream.
  • Days from first contact to signed contract, so you can size your follow-up sequence to reality instead of hope.
  • Unsold quote value by age, treated as an asset you reactivate on a schedule.
  • Average job value by material, which tells you whether three-tier quoting is actually happening in the field.
  • Neighbor-sourced jobs per completed job, the number that turns marketing into a byproduct of production.

Siding is a patient trade. The homeowner takes months to decide, the job is large enough to be scary, and the winner is usually the contractor who was still there when the decision got made. That means the highest-return work in a siding company is almost never in the ad account — it is in answering the phone five times instead of twice, quoting three tiers instead of one, and following up at day 90 when every competitor has already given up.

Find out where your siding quotes are leaking

Send us your lead count, your estimate count and your close rate for last month. We will show you exactly how much revenue is sitting in unanswered calls and abandoned quotes, and what it would take to recover it.

Frequently asked questions

How much does a siding lead cost?

In paid search, cost per lead for residential siding typically runs $120 to $380 depending on the market and the material searched, with fiber cement and premium brand searches costing more and being worth substantially more. That number looks high next to other trades until you put it against job value: a $24,000 fiber cement job at 32% gross margin contributes roughly $7,700, so a $300 lead closing at one in four is a $1,200 acquisition cost against $7,700. The cheaper sources are the ones most contractors ignore — the job site itself, where neighbors watch a five-day transformation on their own street, and unsold quotes from the past twenty-four months, which cost nothing to reactivate and typically convert at 3% to 6% on a single well-timed email.

How long does it take to close a siding job?

The median time from first inquiry to signed contract in residential siding runs 45 to 120 days, and a meaningful share of jobs close six to eighteen months after the first quote. That is far longer than roofing or HVAC, because siding failure is gradual and visible rather than urgent, and because the homeowner is choosing an appearance they will live with for twenty-five years. The practical consequence is that most contractors give up too early: they quote, follow up twice, and write the lead off at day 30, then lose the job at day 90 to someone who simply stayed in touch. A working sequence touches at day 2, 7, 21, 45 and 90, then quarterly, with each touch carrying something useful rather than checking in.

What wins a siding estimate if it isn't price?

Five things, because the homeowner cannot evaluate crew quality or tell two materials apart and therefore judges how you showed up. Physical samples — six to ten boards with real colors and profiles, because nobody picks the look of their house from a brochure. A rendering or color visualizer showing their own house, which closes at a dramatically higher rate and is free from several manufacturers. An honest inspection of what is underneath: pull a piece, show the sheathing and the housewrap and any rot, and photograph it. A written scope that itemizes the boring parts — housewrap, flashing, trim, soffit, fascia, gutter removal, disposal and rot allowance — which makes a cheap competitor's price difference visible instead of arguable. And financing presented on every estimate rather than mentioned only when the customer flinches.

How do you handle rot found during a siding job?

By pricing it before you find it. Rotten sheathing is discovered on a large share of siding replacements, and if expectations were not set in writing you get a change order fight on 30% to 50% of jobs — a fight that costs you the referral, the review and the neighbor, which in this trade is worth more than the sheathing. The fix is to quote a defined rot allowance in the original contract, with a clear per-sheet price beyond it, and to walk the homeowner through it during the estimate while showing photos of what is behind the existing siding. Handled that way, the conversation on job day becomes routine paperwork instead of a dispute, and many homeowners approve additional repairs without hesitation because they were told it might happen.

Should a siding company chase storm and insurance work?

As a supplement, not as the business. In hail and high-wind markets, siding damage rides along with roof claims and a single storm can produce a year of work in one neighborhood, with less price shopping and a compressed timeline. The risks are real, though: payment depends on a third party, scope disputes with adjusters are common, supplements require expertise, and companies that staff up for storm volume with no retail pipeline get caught badly when the work runs out. Contractors who do this well cap storm work at roughly 30% to 50% of annual revenue and keep the retail engine running throughout. And they never tell a homeowner what an insurance company will pay or offer to cover a deductible, both of which create serious legal exposure.