Trapping alone does not stop rodents from coming back. Exclusion seals entry points and is a higher-value service homeowners appreciate.
In this article
Inspection
Look at roofline, vents, garage doors and utility penetrations.
Seal entry points
Use durable materials rodents cannot chew.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Trapping
Remove rodents already inside.
Cleanup
Offer sanitation of attics and crawl spaces.
Warranty
A warranty on sealed points builds trust.
Common mistakes
Sealing rodents inside, cheap materials and no follow-up checks.
Turn your work into your best advertising.
We help home service contractors turn real projects, videos and events into a steady flow of local leads and booked estimates.
Frequently asked questions
What is rodent exclusion?
It means finding and sealing the gaps rodents use to enter the home, often combined with trapping and cleanup.