Outdoor showers are a fun, high-margin add-on.
In this article
Pools
Rinse before swimming.
Beaches
Sand removal.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Materials
Cedar and stone.
Plumbing
Hot and cold.
Drainage
Proper.
A closer look
Beach and pool owners want to keep sand and chlorine out of the house. An attractive outdoor shower becomes a favorite feature.
Where to start
Offer outdoor showers to pool builders' customers.
An example
A carpenter built cedar outdoor showers near the coast. Photos brought steady requests.
Know your numbers
Track installs and average ticket.
A message that works
"A cedar outdoor shower with hot water is $X, installed in three days."
Common mistakes
Poor drainage, cheap materials and no winterizing.
Pricing tip
Price as a package with optional hot water.
How to stand out
Show beautiful photos and offer winterizing in colder areas.
Turn your work into your best advertising.
We help home service contractors turn real projects, videos and events into a steady flow of local leads and booked estimates.
Frequently asked questions
Do outdoor showers need permits?
Often, yes, especially when adding plumbing or hot water. Drainage rules vary by location.