Lead generation

Luxury vinyl plank flooring leads

By Scavi Company · · 3 min read
Luxury vinyl plank flooring leads

Luxury vinyl plank is waterproof, durable and looks like wood. That makes it one of the most requested floors in remodels, and a steady source of jobs for installers.

Why homeowners choose it

Water resistance, a wood look and a lower price than hardwood. Kitchens, basements, bathrooms and rentals are the main jobs.

Rooms that convert

Basements and whole first floors bring the biggest tickets. Rental owners also replace carpet with LVP between tenants.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Subfloor prep

Flatness is everything. Uneven subfloors show up as clicking and gaps, so price the prep honestly.

Quotes per square foot

Separate material, removal of the old floor, prep and installation. Homeowners trust a quote they can read.

Samples

Bring samples to the home. Seeing the color in their own light closes the job.

Trim and transitions

Baseboards, quarter round and transitions are where the job looks professional. Include them in the quote.

Photos

Before and after photos of whole rooms sell the next job. Post them on your profile and on Nextdoor.

Partners

Realtors, property managers and kitchen remodelers send flooring work all year.

Common mistakes

Skipping acclimation, no expansion gap and not undercutting door casings.

A message that works

"We install LVP with proper subfloor prep, new trim and clean transitions. Send us a few photos and the rough size and we will send a price range today."

Turn your work into your best advertising.

We help home service contractors turn real projects, videos and events into a steady flow of local leads and booked estimates.

Frequently asked questions

Can LVP go over an existing floor?

Often yes, if the existing floor is solid, flat and within the manufacturer's tolerances. Always follow the brand's installation instructions to protect the warranty.