Lead generation

Greenhouse installation leads

By Scavi Company · · 3 min read
Greenhouse installation leads

Home gardening keeps growing, and many people buy a greenhouse they cannot assemble. Here is how to win those jobs.

Why greenhouses are a good niche

Home gardeners want to grow vegetables and flowers all year. Many buy a kit online and get stuck with hundreds of parts. Others want a custom greenhouse that looks good in the backyard.

Kit assembly

Assembling kits bought online is a fast, repeatable service with a flat price.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Custom greenhouses

Wood or metal frames with glass or polycarbonate panels bring a much higher ticket.

Foundations

A level, solid base is what keeps the greenhouse standing in wind and snow.

Ventilation

Roof vents, fans and automatic openers prevent overheating.

Water and power

Irrigation, outlets, lights and heaters often need a plumber and an electrician.

Permits

Check local rules for size, setbacks and utilities.

Partners

Garden centers, nurseries, landscapers and garden clubs.

Pricing

Flat price by kit size, and project pricing for custom builds and foundations.

Getting started

Offer assembly to customers of a local garden center that sells kits. Photograph every finished greenhouse for your profile.

Common mistakes

Weak foundations, no anchoring for wind and ignoring ventilation.

Example

A handyman started assembling greenhouse kits for customers of one garden center. He photographed every build and added them to his Google profile. Within a season, customers started asking him for custom greenhouses with irrigation and power, at several times the price of a kit.

Turn your work into your best advertising.

We help home service contractors turn real projects, videos and events into a steady flow of local leads and booked estimates.

Frequently asked questions

Does a backyard greenhouse need a permit?

It depends on the size and the city. Small kit greenhouses are often exempt, while larger ones or those with electricity and water may need a permit.