Lead generation

Gas line installation leads

By Scavi Company · · 3 min read
Gas line installation leads

Gas lines connect many popular upgrades.

Ranges

Kitchen remodels.

Grills

Outdoor kitchens.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Fire pits

Patios.

Generators

Standby units.

Permits

Inspection.

A closer look

Outdoor kitchen builders and generator installers need licensed gas partners. Becoming their go-to installer brings steady referrals.

Where to start

Contact outdoor kitchen and generator companies to offer gas line work.

An example

A licensed plumber partnered with a generator dealer. Most generator installs included his gas line.

Know your numbers

Track partner referrals and permits.

A message that works

"Hi Mark, we'll run the gas line to your new grill, pressure test and schedule inspection."

Common mistakes

Unlicensed work, skipping tests and no permit.

Pricing tip

Price by length and fittings, with permit and inspection listed separately.

Turn your work into your best advertising.

We help home service contractors turn real projects, videos and events into a steady flow of local leads and booked estimates.

Frequently asked questions

Do gas line installations need permits?

Usually yes, and they typically must be done by licensed professionals with inspection and pressure testing.