A broken garbage disposal is an urgent, simple job that homeowners want done the same day. Plumbers and handymen who answer fast win steady work.
In this article
Why the job is easy to sell
The sink is unusable until it is fixed. Homeowners book the first company that gives a clear price.
Quote by phone
Ask for the brand, the horsepower and a photo under the sink. You can price most jobs without a visit.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Offer good, better, best
Show a basic unit, a quieter mid-range model and a premium one. Many customers choose the middle.
Check the connections
Inspect the drain, the dishwasher hose and the outlet. Fixing a leak on the spot adds value.
Add-ons
Air switches, new P-traps and sink stoppers are easy additions.
Common mistakes
Not testing for leaks, leaving the old unit behind and not explaining what can go down the drain.
Turn your work into your best advertising.
We help home service contractors turn real projects, videos and events into a steady flow of local leads and booked estimates.
Frequently asked questions
How long does a garbage disposal replacement take?
Most straightforward replacements take about an hour when the plumbing and electrical connections are already in place.