A soggy yard or water against the foundation worries homeowners. French drains are a practical fix, and contractors who explain them well win the job.
In this article
Signs homeowners notice
Puddles that never dry, mushy lawn, water in the basement or erosion near the foundation. These searches spike after heavy rain.
Inspection
Walk the yard, check the slope and find where the water comes from and where it can go.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Explain the system
Show a simple drawing: trench, gravel, pipe and outlet. Homeowners buy what they understand.
Permits and utilities
Call 811 before digging and check if discharge rules apply. It protects you and the homeowner.
Pricing per foot
Quote per linear foot with clear adders for depth, rock and difficult access.
Restoring the lawn
Include sod or seed in the quote. A messy yard after the job leads to bad reviews.
Photos
Before and after photos after a storm are your strongest proof.
Partners
Landscapers, foundation repair companies and home inspectors find drainage problems every week.
Common mistakes
No outlet for the water, too little slope and skipping the fabric that keeps soil out of the gravel.
A message that works
"Water sitting in your yard after rain? We inspect the slope, find where the water can go and quote a french drain per foot, lawn repair included."
How to start
Post after every storm in local groups and offer quick inspections that week.
Turn your work into your best advertising.
We help home service contractors turn real projects, videos and events into a steady flow of local leads and booked estimates.
Frequently asked questions
How do I price a french drain?
Most contractors price per linear foot, adjusting for depth, soil, access and where the water will be discharged. Show the layout on a simple drawing so the homeowner understands the scope.