Lead generation

Faucet replacement leads

By Scavi Company · · 3 min read
Faucet replacement leads

Dripping faucets and dated fixtures are small jobs that homeowners put off until a friendly contractor makes it easy.

Kitchen and bathroom

Kitchen faucets with pull-down sprayers and bathroom sets are the most requested.

Customer-supplied fixtures

Decide your policy and price for installing fixtures bought online.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Shutoff valves

Old shutoffs often fail when turned. Quote replacement upfront.

Bundle small jobs

Faucets, a running toilet and a new showerhead in one visit make the trip worth it.

Photos

Before and after photos of updated fixtures look great on your profile.

Common mistakes

Not checking the sink holes, forgetting supply lines and leaving drips at the connections.

Turn your work into your best advertising.

We help home service contractors turn real projects, videos and events into a steady flow of local leads and booked estimates.

Frequently asked questions

Can I install a faucet the customer bought?

Many contractors do, with a clear note that the warranty on the product is the manufacturer's. Inspect the box before starting to avoid missing parts.