Water from downspouts often pools near foundations. Extensions and buried drains move it away.
In this article
Problem signs
Pooling and erosion.
Extensions
Simple fixes.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Buried drains
Clean look.
Pop-up emitters
Discharge points.
Maintenance
Clear debris.
Common mistakes
Short extensions, poor slope and clogged drains.
Turn your work into your best advertising.
We help home service contractors turn real projects, videos and events into a steady flow of local leads and booked estimates.
Frequently asked questions
How far should downspouts discharge from the house?
Far enough to keep water away from the foundation, following local guidance and site conditions.