New curtains and rods change a room, but installing them evenly in every window takes skill and the right tools.
In this article
Height and width
Mounting higher and wider makes windows look bigger.
Heavy drapes
Need strong brackets and anchors.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Motorized options
Smart curtains are a growing request.
Whole-house jobs
New homes need curtains in every room.
Partners
Interior designers and curtain shops need installers.
Common mistakes
Uneven rods, weak anchors and drapes that drag on the floor.
Turn your work into your best advertising.
We help home service contractors turn real projects, videos and events into a steady flow of local leads and booked estimates.
Frequently asked questions
How high should curtain rods be installed?
Many designers mount rods above the window frame to make windows look taller. Agree on the height with the customer before drilling.