A cracked crown or missing cap lets water, animals and debris into the chimney. Chimney sweeps and masons can offer these repairs on every inspection.
In this article
Why it matters
Water damage inside chimneys is expensive and often hidden.
Inspection photos
Show the homeowner what you see on the roof.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Caps
Caps keep out rain and animals and are easy to install.
Crown repair
Sealing, resurfacing or rebuilding depending on the damage.
Bundle
Combine with sweeping and waterproofing.
Common mistakes
No photos, unsafe roof access and sealing over a crumbling crown.
Turn your work into your best advertising.
We help home service contractors turn real projects, videos and events into a steady flow of local leads and booked estimates.
Frequently asked questions
Why does the chimney crown crack?
Weather, freeze-thaw cycles and poor original construction can cause cracks. Small cracks can sometimes be sealed, while larger damage may need a rebuild.