Lead generation

Ceiling fan installation leads

By Scavi Company · · 3 min read
Ceiling fan installation leads

Fan installations are quick jobs that build loyal customers.

New fans

Replacement.

Support

Fan-rated boxes.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

High ceilings

Ladders.

Smart controls

Upgrade.

Pricing

Per fan.

A closer look

Summer brings fan installs. Customers want them done quickly and safely, and many buy several at once.

Where to start

Offer multi-fan pricing before summer.

An example

A handyman offered a summer fan package. Many homeowners installed fans in every bedroom.

Know your numbers

Track fans installed and add-ons.

A message that works

"Installing three fans with new support boxes is $X. We can do Friday."

Common mistakes

Unrated boxes, wobbling fans and no cleanup.

Pricing tip

Charge per fan with extra for high ceilings and new boxes.

Turn your work into your best advertising.

We help home service contractors turn real projects, videos and events into a steady flow of local leads and booked estimates.

Frequently asked questions

Can a ceiling fan be installed where a light fixture was?

Often yes, but the box must be rated to support a fan. Many installations require replacing the box.