Appliance installation is steady work tied to every appliance sale in your area.
In this article
Why it works
Online appliance sales often skip installation. Buyers need someone fast.
Store partners
Independent appliance dealers.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Hookups
Water, gas and venting done safely and to code.
Permits
Some gas work requires licensing.
Haul-away
Remove the old unit.
Where to start
Visit three independent appliance stores and offer same-week installs.
An example
An installer partnered with a local appliance dealer. The dealer referred customers who bought without installation.
Know your numbers
Track installs per week, referral source and callbacks.
A message that works
"Hi Kim! We can install your new dishwasher Thursday, haul away the old one and test for leaks."
Common mistakes
Gas work without proper licensing, skipping leak tests and no haul-away option.
Who buys it
Homeowners who bought appliances online, landlords replacing units between tenants, remodelers who need a reliable installer at the end of a kitchen project and builders finishing new homes.
How to stand out
Offer same-week scheduling, test every connection in front of the customer and leave the area cleaner than you found it. Photos of a tidy installation build trust with store partners.
Turn your work into your best advertising.
We help home service contractors turn real projects, videos and events into a steady flow of local leads and booked estimates.
Frequently asked questions
Who needs appliance installation?
Homeowners who buy appliances online or from stores without installation, landlords, remodelers and builders.